Scheduled activities for Week 01:

M Jan 04 (004)  
T Jan 05 (005)  Behind: SECCHI stepped calibration roll, 12:15
		Behind: SECCHI warm restart, 21:25, corrupted images
W Jan 06 (006)  HGA calibration, Ahead 14:00 UT, Behind 16:00 UT
		Behind: SECCHI corrupted images until 4 UT
T Jan 07 (007)  EIT shutterless (TBC)
F Jan 08 (008)  
S Jan 09 (009)  
S Jan 10 (010)  

-------------------------------------------------------------------------------
Scheduled activities for Week 02:

M Jan 11 (011)  Start of JOP 225
T Jan 12 (012)  
W Jan 13 (013)  
T Jan 14 (014)  
F Jan 15 (015)  EIT shutterless (TBC)
S Jan 16 (016)  
S Jan 17 (017)  

Notes:
* JOP 225, STEREO/SOHO Joint Plume Campaign, Jan 11-18

-------------------------------------------------------------------------------
Scheduled activities for Week 03:

M Jan 18 (018)  End of JOP 225
T Jan 19 (019)  Ahead: Momentum dump, 16:00 UT
		Behind: SECCHI stepped calibration roll, 8:40 UT
W Jan 20 (020)  
T Jan 21 (021)  
F Jan 22 (022)  
S Jan 23 (023)  
S Jan 24 (024)  

Notes:
* JOP 225, STEREO/SOHO Joint Plume Campaign, Jan 11-18

-------------------------------------------------------------------------------
Scheduled activities for Week 04:

M Jan 25 (025)  
T Jan 26 (026)  Behind: SECCHI software load, 13:00 UT
W Jan 27 (027)  
T Jan 28 (028)  
F Jan 29 (029)  
S Jan 30 (030)  
S Jan 31 (031)  

-------------------------------------------------------------------------------
Scheduled activities for Week 05:

M Feb 01 (032)  
T Feb 02 (033)  Ahead: SECCHI software load, 17:00 UT
W Feb 03 (034)  Behind: Momentum dump, 18:00 UT
T Feb 04 (035)  
F Feb 05 (036)  
S Feb 06 (037)  
S Feb 07 (038)  

-------------------------------------------------------------------------------
Scheduled activities for Week 06:

M Feb 08 (039)  Both: Move pointers during pass
T Feb 09 (040)  
W Feb 10 (041)  
T Feb 11 (042)  Ahead: Move pointers during pass
		Behind: SECCHI watchdog reset, 8:39-13:25 UT
F Feb 12 (043)  
S Feb 13 (044)  
S Feb 14 (045)  

-------------------------------------------------------------------------------
Scheduled activities for Week 07:

M Feb 15 (046)  
T Feb 16 (047)  
W Feb 17 (048)  
T Feb 18 (049)  
F Feb 19 (050)  
S Feb 20 (051)  Behind: SECCHI watchdog reset, 00:38-03:05 UT
S Feb 21 (052)  

-------------------------------------------------------------------------------
Scheduled activities for Week 08:

M Feb 22 (053)  
T Feb 23 (054)  Ahead: SECCHI stepped calibration roll, 2:10 UT
W Feb 24 (055)  
T Feb 25 (056)  ICAL001, 11 UT
F Feb 26 (057)  
S Feb 27 (058)  
S Feb 28 (059)  

-------------------------------------------------------------------------------
Scheduled activities for Week 09:

M Mar 01 (060)  
T Mar 02 (061)  
W Mar 03 (062)  
T Mar 04 (063)  
F Mar 05 (064)  
S Mar 06 (065)  Behind: Move pointers during pass
S Mar 07 (066)  

-------------------------------------------------------------------------------
Scheduled activities for Week 10:

M Mar 08 (067)  Ahead: Momentum dump, 15:30 UT
T Mar 09 (068)  
W Mar 10 (069)  
T Mar 11 (070)  
F Mar 12 (071)  
S Mar 13 (072)  
S Mar 14 (073)  Daily Savings Time starts in U.S.

-------------------------------------------------------------------------------
Scheduled activities for Week 11:

M Mar 15 (074)  
T Mar 16 (075)  
W Mar 17 (076)  ICAL01: 11 UT
T Mar 18 (077)  Behind: 720 kbps downlink on station 43.  Pointers moved.
		Behind: Momentum dump, 21:30 UT
F Mar 19 (078)  
S Mar 20 (079)  
S Mar 21 (080)  

-------------------------------------------------------------------------------
Scheduled activities for Week 12:

M Mar 22 (081)  
T Mar 23 (082)  
W Mar 24 (083)  
T Mar 25 (084)  Behind: 720 kbps downlink on station 43.  Pointers moved.
F Mar 26 (085)  
S Mar 27 (086)  
S Mar 28 (087)  

-------------------------------------------------------------------------------
Scheduled activities for Week 13:

M Mar 29 (088)  
T Mar 30 (089)  
W Mar 31 (090)  
T Apr 01 (091)  Behind: 720 kbps downlink on station 43.  Pointers moved.
F Apr 02 (092)  
S Apr 03 (093)  
S Apr 04 (094)  Behind: Aphelion, 17:59 UT

-------------------------------------------------------------------------------
Scheduled activities for Week 14:

M Apr 05 (095)  
T Apr 06 (096)  Behind: SECCHI stepped calibration roll, 17:05 UT
W Apr 07 (097)  
T Apr 08 (098)  
F Apr 09 (099)  
S Apr 10 (100)  
S Apr 11 (101)  

-------------------------------------------------------------------------------
Scheduled activities for Week 15:

M Apr 12 (102)  
T Apr 13 (103)  
W Apr 14 (104)  Ahead: Return-to-service track on station 34.
T Apr 15 (105)  
F Apr 16 (106)  
S Apr 17 (107)  
S Apr 18 (108)  

-------------------------------------------------------------------------------
Scheduled activities for Week 16:

M Apr 19 (109)  Ahead: Begin 7 hour daily DSN tracks
		Ahead: Test of 240 and 120 kbps telemetry rates, 17:00 UT
T Apr 20 (110)  
W Apr 21 (111)  Ahead: Momentum dump, 16:00 UT
T Apr 22 (112)  Ahead: 720 kbps downlink on station 43 (Switched to 34 meter)
F Apr 23 (113)  
S Apr 24 (114)  
S Apr 25 (115)  

-------------------------------------------------------------------------------
Scheduled activities for Week 17:

M Apr 26 (116)  Ahead:  Switch downlink rate to 240 kbps
T Apr 27 (117)  Behind: Momentum dump, 20:30 UT
		Ahead:  SECCHI watchdog reset, 18:49 UT
W Apr 28 (118)  Behind: SECCHI-driven GT calibration offpoint, 7:30 UT
		Ahead:  Recovery from watchdog reset, 13:08 UT
T Apr 29 (119)  
F Apr 30 (120)  
S May 01 (121)  
S May 02 (122)  

-------------------------------------------------------------------------------
Scheduled activities for Week 18:

M May 03 (123)  EVE calibration sounding rocket launch, 18:12 UT
T May 04 (124)  
W May 05 (125)  
T May 06 (126)  SECCHI HI stray light cal. offpoint, Ahead: 09:35, Behind: 17:50
F May 07 (127)  
S May 08 (128)  
S May 09 (129)  

-------------------------------------------------------------------------------
Scheduled activities for Week 19:

M May 10 (130)  
T May 11 (131)  
W May 12 (132)  
T May 13 (133)  
F May 14 (134)  
S May 15 (135)  
S May 16 (136)  

-------------------------------------------------------------------------------
Scheduled activities for Week 20:

M May 17 (137)  
T May 18 (138)  Ahead: SECCHI stepped calibration roll, 00:25 UT
		Ahead: Perihelion, 18:57 UT
		Behind: 31 hour gap between passes
W May 19 (139)  
T May 20 (140)  Ahead: 34 hour gap between passes
F May 21 (141)  Behind: 35.5 hour gap between passes
S May 22 (142)  Ahead: SECCHI watchdog reset
S May 23 (143)  

Notes:

* Large data gaps May 22-26 on Behind due to insufficient track coverage
  combined with a lost track on May 24.

-------------------------------------------------------------------------------
Scheduled activities for Week 21:

M May 24 (144)  
T May 25 (145)  
W May 26 (146)  Ahead: SECCHI GT calibration offset, 9:25 UT
T May 27 (147)  
F May 28 (148)  
S May 29 (149)  
S May 30 (150)  

Notes:

* Large data gaps May 22-26 on Behind due to insufficient track coverage
  combined with a lost track on May 24.

* Commercial power will off at APL during Memorial Day weekend, May 28-31.  The
  STEREO MOC will be operating on UPS and a generator.

-------------------------------------------------------------------------------
Scheduled activities for Week 22:

M May 31 (151)  
T Jun 01 (152)  
W Jun 02 (153)  
T Jun 03 (154)  
F Jun 04 (155)  Ahead: Momentum dump, 14:00 UT
S Jun 05 (156)  
S Jun 06 (157)  

Notes:

* Commercial power will off at APL during Memorial Day weekend, May 28-31.  The
  STEREO MOC will be operating on UPS and a generator.

-------------------------------------------------------------------------------
Scheduled activities for Week 23:

M Jun 07 (158)  
T Jun 08 (159)  
W Jun 09 (160)  Behind: Momentum dump, 21:30 UT
T Jun 10 (161)  Ahead: Engineering test on station 25
F Jun 11 (162)  
S Jun 12 (163)  
S Jun 13 (164)  

Notes:

* Intermittent data losses for in situ instruments starting Jun 8 due to
  insufficient track coverage.

-------------------------------------------------------------------------------
Scheduled activities for Week 24:

M Jun 14 (165)  
T Jun 15 (166)  
W Jun 16 (167)  ICAL01, 11 UT
T Jun 17 (168)  
F Jun 18 (169)  SECCHI 304 observations with SST, 8-12 UT
S Jun 19 (170)  SECCHI 304 observations with SST, 8-12 UT
S Jun 20 (171)  SECCHI 304 observations with SST, 8-12 UT

Notes:

* SUMER campaign, June 18-29
* SECCHI 304 A co-observations with Swedish Solar Telescope, 3 days within
  June 15-22, between 8-12 UT
* JOP 227, Doppler shift oscillations of AR loops, June 20-30
* Intermittent data losses for in situ instruments expected through Jun 19 due
  to insufficient track coverage.

-------------------------------------------------------------------------------
Scheduled activities for Week 25:

M Jun 21 (172)	SECCHI 304 observations with SST, 8-12 UT
T Jun 22 (173)	SECCHI 304 observations with SST, 8-12 UT
W Jun 23 (174)  Behind: JOP 227, 0-6 UT
T Jun 24 (175)
F Jun 25 (176)	Behind: 720 kbps on station 43
S Jun 26 (177)
S Jun 27 (178)  Ahead: JOP 227, 2-10 UT

Notes:

* SUMER campaign, June 18-29
* SECCHI 304 A co-observations with Swedish Solar Telescope, 3 days within
  June 15-22, between 8-12 UT
* JOP 227, Doppler shift oscillations of AR loops, June 20-30

-------------------------------------------------------------------------------
Scheduled activities for Week 26:

M Jun 28 (179)
T Jun 29 (180)
W Jun 30 (181)
T Jul 01 (182)  Behind: HGA Calibration, 21:00 UT
F Jul 02 (183)
S Jul 03 (184)	Behind: 720 kbps on station 43
S Jul 04 (185)

Notes:

* SUMER campaign, June 18-29
* JOP 227, Doppler shift oscillations of AR loops, June 20-30

-------------------------------------------------------------------------------
Scheduled activities for Week 27:

M Jul 05 (186)  
T Jul 06 (187)  
W Jul 07 (188)  
T Jul 08 (189)  
F Jul 09 (190)  
S Jul 10 (191)  
S Jul 11 (192)  Total solar eclipse
	http://eclipse.gsfc.nasa.gov/SEmono/TSE2010/TSE2010.html

Notes:

* HOP 114: Coordinated Diagnostics of Prominence Cavities, to run
  concurrent with solar eclipse, Jul 11

-------------------------------------------------------------------------------
Scheduled activities for Week 28:

M Jul 12 (193)  
T Jul 13 (194)  
W Jul 14 (195)  
T Jul 15 (196)  Ahead: HGA Calibration, 15:00 UT
F Jul 16 (197)  Ahead: Momentum dump, 14:00 UT
S Jul 17 (198)  
S Jul 18 (199)  

-------------------------------------------------------------------------------
Scheduled activities for Week 29:

M Jul 19 (200)  
T Jul 20 (201)  
W Jul 21 (202)  
T Jul 22 (203)  Behind: Momentum dump, 17:00 UT
F Jul 23 (204)  
S Jul 24 (205)  
S Jul 25 (206)  

-------------------------------------------------------------------------------
Scheduled activities for Week 30:

M Jul 26 (207)  
T Jul 27 (208)  
W Jul 28 (209)  
T Jul 29 (210)  Behind: SECCHI watchdog reset, 14-24 UT
F Jul 30 (211)  SUMI sounding rocket launch, 18:11 UT
	http://adsabs.harvard.edu/abs/2008AGUSMSP51B..01A
S Jul 31 (212)  
S Aug 01 (213)  

Notes:

* Data gaps on Behind Aug 1-2 due to lost track on Aug 1.

-------------------------------------------------------------------------------
Scheduled activities for Week 31:

M Aug 02 (214)  
T Aug 03 (215)  Behind: SECCHI stepped calibration roll, 14:00 UT
W Aug 04 (216)  
T Aug 05 (217)  
F Aug 06 (218)  
S Aug 07 (219)  
S Aug 08 (220)  

Notes:

* Data gaps on Behind Aug 1-2 due to lost track on Aug 1.

-------------------------------------------------------------------------------
Scheduled activities for Week 32:

M Aug 09 (221)  
T Aug 10 (222)  Ahead: SECCHI stepped calibration roll, 08:10 UT
W Aug 11 (223)  
T Aug 12 (224)  
F Aug 13 (225)  
S Aug 14 (226)  
S Aug 15 (227)  

-------------------------------------------------------------------------------
Scheduled activities for Week 33:

M Aug 16 (228)  
T Aug 17 (229)  
W Aug 18 (230)  
T Aug 19 (231)  
F Aug 20 (232)  
S Aug 21 (233)  
S Aug 22 (234)  

-------------------------------------------------------------------------------
Scheduled activities for Week 34:

M Aug 23 (235)  
T Aug 24 (236)  
W Aug 25 (237)  
T Aug 26 (238)  
F Aug 27 (239)  
S Aug 28 (240)  
S Aug 29 (241)  

-------------------------------------------------------------------------------
Scheduled activities for Week 35:

M Aug 30 (242)  
T Aug 31 (243)  Ahead: Momentum dump, 13:30 UT
W Sep 01 (244)  
T Sep 02 (245)  
F Sep 03 (246)  
S Sep 04 (247)  Ahead: Shadow track on station 15 for testing
S Sep 05 (248)  

-------------------------------------------------------------------------------
Scheduled activities for Week 36:

M Sep 06 (249)  
T Sep 07 (250)  Behind: Momentum dump, 22:30 UT
W Sep 08 (251)  Ahead: PIT test
T Sep 09 (252)  
F Sep 10 (253)  Ahead: PIT test
S Sep 11 (254)  
S Sep 12 (255)  

Notes:

* Network maintenance at APL, Sep 11, 11:30-15:00 UT

-------------------------------------------------------------------------------
Scheduled activities for Week 37:

M Sep 13 (256)  
T Sep 14 (257)  
W Sep 15 (258)  
T Sep 16 (259)  
F Sep 17 (260)  
S Sep 18 (261)  
S Sep 19 (262)  

-------------------------------------------------------------------------------
Scheduled activities for Week 38:

M Sep 20 (263)  
T Sep 21 (264)  
W Sep 22 (265)  Ahead: Return-to-service track on station 65
T Sep 23 (266)  
F Sep 24 (267)  
S Sep 25 (268)  
S Sep 26 (269)  

-------------------------------------------------------------------------------
Scheduled activities for Week 39:

M Sep 27 (270)  
T Sep 28 (271)  
W Sep 29 (272)  
T Sep 30 (273)  End of extended mission #1
F Oct 01 (274)  
S Oct 02 (275)  
S Oct 03 (276)  

-------------------------------------------------------------------------------
Scheduled activities for Week 40:

M Oct 04 (277) 
T Oct 05 (278)  Ahead: Change beacon modulation index, 16:15 UT
W Oct 06 (279) 
T Oct 07 (280)  
F Oct 08 (281)  Ahead: Return-to-service track on station 14
                Behind: SECCHI stepped calibration roll, 11:15 UT
		Both: Disable soft command loss timer
S Oct 09 (282) 
S Oct 10 (283) 

-------------------------------------------------------------------------------
Scheduled activities for Week 41:

M Oct 11 (284)  
T Oct 12 (285)  IONet down 12-21 UT
W Oct 13 (286)  
T Oct 14 (287)  
F Oct 15 (288)  Ahead: Momentum dump, 14:00 UT
S Oct 16 (289)  Behind: Aphelion
S Oct 17 (290)	

-------------------------------------------------------------------------------
Scheduled activities for Week 42:

M Oct 18 (291)  Both: Re-enable soft command loss timer
T Oct 19 (292)  
W Oct 20 (293)  
T Oct 21 (294)  
F Oct 22 (295)  
S Oct 23 (296)  
S Oct 24 (297)  

-------------------------------------------------------------------------------
Scheduled activities for Week 43:

M Oct 25 (298)  
T Oct 26 (299)  Fourth anniversary of STEREO's launch
W Oct 27 (300)  Behind: Change modulation index for beacon telemetry
T Oct 28 (301)  Behind: Momentum dump, 17:30 UT
F Oct 29 (302)  
S Oct 30 (303)  
S Oct 31 (304)  

-------------------------------------------------------------------------------
Scheduled activities for Week 44:

M Nov 01 (305)  
T Nov 02 (306)  
W Nov 03 (307)  
T Nov 04 (308)  
F Nov 05 (309)  
S Nov 06 (310)  Ahead: Aphelion
S Nov 07 (311)  Daily savings time ends in U.S.

-------------------------------------------------------------------------------
Scheduled activities for Week 45:

M Nov 08 (312)  
T Nov 09 (313)  Ahead: SECCHI stepped calibration roll, 08:30 UT
W Nov 10 (314)  
T Nov 11 (315)  
F Nov 12 (316)  
S Nov 13 (317)  
S Nov 14 (318)  

-------------------------------------------------------------------------------
Scheduled activities for Week 46:

M Nov 15 (319)  
T Nov 16 (320)  
W Nov 17 (321)  
T Nov 18 (322)  
F Nov 19 (323)  
S Nov 20 (324)  Ahead:  SECCHI watchdog reset, 06:31-15:30 UT
S Nov 21 (325)  

-------------------------------------------------------------------------------
Scheduled activities for Week 47:

M Nov 22 (326)  
T Nov 23 (327)  
W Nov 24 (328)  
T Nov 25 (329)  US Thanksgiving
F Nov 26 (330)  
S Nov 27 (331)  
S Nov 28 (332)  

Notes:

* APL closed both Nov 25 and Nov 26

-------------------------------------------------------------------------------
Scheduled activities for Week 48:

M Nov 29 (333)  
T Nov 30 (334)  
W Dec 01 (335)  Behind: Shadow track on station 25
T Dec 02 (336)  Ahead:  Momentum dump, 15:00 UT
F Dec 03 (337)  Ahead:  SECCHI watchdog reset, 17:32 UT
S Dec 04 (338)  Ahead:  Recovery from SECCHI watchdog reset, 13:40 UT
S Dec 05 (339)  

-------------------------------------------------------------------------------
Scheduled activities for Week 49:

M Dec 06 (340)  
T Dec 07 (341)  
W Dec 08 (342)  
T Dec 09 (343)  
F Dec 10 (344)  
S Dec 11 (345)  
S Dec 12 (346)  

-------------------------------------------------------------------------------
Scheduled activities for Week 50:

M Dec 13 (347)  
T Dec 14 (348)  
W Dec 15 (349)  Behind: Momentum dump, 17:30 UT
T Dec 16 (350)  Ahead:  SECCHI calibration roll, 13:20 UT
F Dec 17 (351)  
S Dec 18 (352)  
S Dec 19 (353)  

-------------------------------------------------------------------------------
Scheduled activities for Week 51:

M Dec 20 (354)  
T Dec 21 (355)  
W Dec 22 (356)  
T Dec 23 (357)  
F Dec 24 (358)  
S Dec 25 (359)  Christmas
S Dec 26 (360)  

Notes:

* APL will be closed on Dec 24

-------------------------------------------------------------------------------
Scheduled activities for Week 52:

M Dec 27 (361)  
T Dec 28 (362)  
W Dec 29 (363)  
T Dec 30 (364)  
F Dec 31 (365)  
S Jan 01 (001)  New Years
S Jan 02 (002)  Ahead: SECCHI watchdog reset, 5:55-13:50 UT

Notes:

* APL will be closed on Dec 31

-------------------------------------------------------------------------------

 

Plans last modified Tuesday, 06-Mar-2012 21:16:11 UTC


Last Revised: Tuesday, 12-Jan-2010 19:24:12 UTC
Responsible NASA Official: [email address: Therese.A.Kucera<at>nasa<dot>gov]
Accessibility
Privacy Policy and Important Notices
Feedback and comments: webmaster