Viewed On: 01/22/2004 15:55:15, attachments at bottom of page. | Save As HTML | Print This Page |
Details for
STEREO-WOA663026-001 Stage: PR |
Date/Time Submitted: 01/21/2004 13:23 | |
Project: STEREO | ||
Submittor Info: Name: Pam Hopkins Code: 303.0 Phone: +1 301 286-1059 Email: phopkins@pop400.gsfc.nasa.gov |
Spacecraft: STEREO Ahead Spacecraft (STEREO-A) | |
Subsystem/Instrument: IMPACT | ||
Component: SEP | ||
Date/Time of Actual Problem: 01/21/2004 00:00 | Assembly: [left blank] | |
WOA#: WOA663026 | Event/Operation Line Number: [left blank] | |
Configuration Type: Flight | Item Number: GD2054170 | |
Item Revision: - | Serial Number: 001,002 | |
Software Version: [left blank] | ||
Problem Description: SIT Energy Board, connector hardware mis-fit. The mounting hardware for the connector P1 does not align with the holes in the board. | ||
Problem Addendum 1 (by Lil
Reichenthal on 01/22/2004 15:50): This fix applies to both SIT Energy Boards (Spacecraft A and
B) | ||
Required Approvals for Closure: (One
signature(s) required from Project Side (minimum role PDL)
AND One signature(s) required from QA Side (minimum
role QE)
| ||
Disposition to Close: (last edited by Lil
Reichenthal on 01/22/2004 15:52) See Attachment |